Heyu Heavy Industry | Small car mounted pump | Tunnel car mounted pump | Secondary lining car mounted pump | Limited width car mounted pump | Small tunnel car mounted pump | Diesel car mounted pump | Water diversion tunnel car mounted pump | Filling industrial pump | Industrial filling pump | Paste filling industrial pump | HGBS filling industrial pump | Full tailings filling industrial pump | Piston filling industrial pump | S-valve industrial filling pump | Cone valve filling industrial pump | Tailings filling equipment | Mine filling | Mine paste filling | Mine small filling station | Low cost mine filling | Mine mixing tank | Tailings thickener | Filling pump | Mine filling system | Full tailings filling | Paste filling | Paste bonding filling | One key filling system | Mine full tailings filling system | HBT concrete pump | Secondary lining concrete pump | Tunnel conveying pump Hunan Heyu Heavy Industry Machinery Co., Ltd. [Official website] 18607314028
Case Categories
Contact Us
18674833459
Mobile:15874876610
Tel:     18674833459


Case
Current Location:Home > Case > Case
Add Time:2024-08-10
哈尔滨混凝土湿喷机械手配件和宇重工车载湿喷机配件哈尔滨混凝土湿喷机械手配件和宇重工车载湿喷机配件

七、施工注意事项

(1) 进入工地,操作工马上下车,指挥车辆安全进入施工现场,注意路基情况,看能否进车,有无钉子和突出的钢筋杂务,以防陷车和爆胎。

(2)进入现场后,操作工根据具体施工情况确定泵车摆放到安全位置。问清工地情况,看泵车支腿位有无下水道、化粪池,是否斜坡,是否填土,上空有无高压电线,确保泵车安全有效支腿(枕木一定垫好)。

(3)展开臂架、放下软管试臂架动作看有无妨碍,打空泵几分钟并手动润滑只到大小轴承座出油。

(4) 泵送时先打砂浆后打砼料,如工地现拌砂浆进如料斗后加水反泵十几次,让砂浆充分和匀再正泵。此时臂架软管摆到无人处,等砼料打通后再移到指定位置泵送。切记十分重要!

(5)泵送初始,检查支腿是否牢固可靠,如不行,从新支牢。

(6)泵送开始,每泵送一车砼料,润滑 4-5次(自动润滑除外)或每隔半小时润滑20次。根据工地施工情况调整泵送排量大小。

(7) 泵送中途因料的原因或其它因素堵管,立即反泵两次再正泵,如不能打通,立即停止,到电控柜文本显示器近控操作,发动机手动升速后再选择第五项摆缸点动,反复点动几次,再反泵几次,再正泵如仍不能解决则判断堵在何处拆管解决,拆管前一定要先反泵泄压。

(8)泵送时如待料时间过长,每隔15分钟反泵/正泵几次,如时间太久,掉转臂架软管对准料斗正泵打循环。

(9)泵送时严禁接管(臂架易损伤),臂架尽量保持抛物线状或水平,严禁最后一节臂反翘泵送(油缸易弯)。

(10)臂架远离高压线5M(十分危险)。

(11)泵送中经常检查支腿是否牢固,油温(正常65度以下),如超过65度则停止泵送检查原因,看散热风扇转动是否正常,洗涤室内水量是否够,分动箱油量是多或少。

(12)检查有无异常响声,和平常有何不一样。