Heyu Heavy Industry | Small car mounted pump | Tunnel car mounted pump | Secondary lining car mounted pump | Limited width car mounted pump | Small tunnel car mounted pump | Diesel car mounted pump | Water diversion tunnel car mounted pump | Filling industrial pump | Industrial filling pump | Paste filling industrial pump | HGBS filling industrial pump | Full tailings filling industrial pump | Piston filling industrial pump | S-valve industrial filling pump | Cone valve filling industrial pump | Tailings filling equipment | Mine filling | Mine paste filling | Mine small filling station | Low cost mine filling | Mine mixing tank | Tailings thickener | Filling pump | Mine filling system | Full tailings filling | Paste filling | Paste bonding filling | One key filling system | Mine full tailings filling system | HBT concrete pump | Secondary lining concrete pump | Tunnel conveying pump Hunan Heyu Heavy Industry Machinery Co., Ltd. [Official website] 18607314028
News Categories
Contact Us
18674833459
Mobile:15874876610
Tel:     18674833459


News
Current Location:Home > News > News
矿山膏体充填中铁矿充填开采配比应用
Add Time:2022-10-19
  田形口四四国*109:29X Q铁矿充填〈充填工业泵.工业充填泵.膏体充填系统.尾砂充填系统返回采矿技术3.5充填工艺3.5.1工艺流程(1)选厂全尾砂经输送泵加压输送至充填站立式砂仓中,自然沉降,充填前排出全尾砂料面上的澄清水,采用压气造浆。砂仓中全尾砂造浆均匀后,再由放砂管放料,向搅拌机供给全尾砂浆。(2)散装胶固粉运至充填站,经给料机及电子秤计量后向搅拌机供给。 (3)全尾砂浆与胶固粉的混合料搅拌均匀后制备成具有结构流特性的充填料浆,通过充填钻孔及井下输送管道自不输送至采空区充填。 田,76口8四国*109:29X Q铁矿充填〈返回采矿技术3.5.4矿房铺网部分矿房回采完成后底板仍是矿石,为了提高回收底板矿石的安全性,必须铺网。采用6mm钢筋,钢筋网片规格为2m×8m,网孔规格为 200mm×200mm,纵筋和横筋两端弯钩背向底板,每2片钢筋网用弯钩连接,每片网片中各竖立3根6mm×1.2m钢筋。 3.5.5接顶工作为了保证充填体接顶,当采场中的充填体距离顶板高度为0.5m时,添加不泥膨胀剂,使充填体产生膨胀尽可能按J顶。充填体28d强度大于2MPa。堵口施工现场见图3。充填接顶现场见图4。 ☆3.5.2充填料配比南洺河铁矿充填料配比为(1:4.5)☆